Projects Commissioned
1) M/s Kamachi Sponge and Power Corporation Limited
- Electrical & Control Instrumentation Balance of Plant (E& CI BOP)
- 230 kV, 6 bay Switchyard including
- Two (2) Generator Transformers (GT) rated 35 / 45 MVA
- Two (2) Unit Auxiliary Transformers (UAT) of rating 8 MVA
- Six (6) Distribution Transformers (DT) of rating 2 MVA
- 4 km long 230 kV double circuit transmission line
Commissioning Date: May 2010
2) M/s Indian Seamless Metals & Tubes Limited
- Electrical & Control Instrumentation Balance of Plant (E& CI BOP)
- One (1) Unit Auxiliary Transformer (UAT) of rating 7 MVA
- Three (3) Distribution Transformers (DT) of rating 2 MVA
3) M/s Tulsyan NEC Limited
Electrical & Control Instrumentation Balance of Plant (E& CI BOP)
- 110 kV, 8 bay Switchyard including
- Two (2) Generator Transformers (GT) rated 35 / 45 MVA
- Two (2) Unit Auxiliary Transformers (UAT) of rating 8 MVA
- Six (6) Distribution Transformers (DT) of rating 2 MVA
4) M/s Tulsyan NEC Limited
- 33 kV, 4 bay Switchyard including all switchyard equipments
5) M/s SBQ Steels Limited
- Electrical & Control Instrumentation Balance of Plant (E& CI BOP)
- 9 bay 220kV Gas Insulated Outdoor Substation (GIS) including:
- Two (2) Generating Transformers (GT) of rating 50 / 60 MVA,
- Two (2) Auto Transformers of rating 50 / 60 MVA,
- Two (2) Unit auxiliary transformers (UAT) of rating 8 MVA,
- Two (2) Station Transformers of rating 12 MVA,
- Ten (10) Distribution Transformers of rating 2 MVA.
6) M/s Gamesa Wind Turbines Private Limited
- 110 kV, 7 bay Switchyard
- 33 kV, 12 bay Switchyard
- Four (4) Transformers (GT) rated 25 MVA
Commissioning Date: Feb 2011
7) National Thermal Power Corporation (NTPC) India
- 220kV Single Bay Switchyard
- 7.5 MVA 33/220 kV Transformer
- 33kV Single Circuit Transmission line- 13Km
8) Third Party Inspection (For TCIL) – For Government of India Scheme, “Rajiv Gandhi Grameen Vidyutikaran Yojana” (RGGVY) – Implementation underway in the State of Jharkhand (Fundamental Implementation rules followed – REC, BIS & IER)
10TH Plan (Five year plan) – 100% Inspection of 4720 Villages which covers approximately 5,00,000 households
9) Third Party Inspection (For TCIL) – For Government of India Scheme, “Rajiv Gandhi Grameen Vidyutikaran Yojana”(RGGVY) – Implementation underway in the regions of “Uttar Haryana and Dakshin Haryana”. (Fundamental Implementation rules followed – REC, BIS & IER) and Field Inspection Checklist & necessary formats were developed by us.
11th Plan (Five year plan) – 2,000 Villages and approximately 2,00,000 households are being inspected.
10) Wind Power Evacuation Facilities for M/s Gamesa Wind Turbines Private Limited
- 220kV Switchyards to evacuate excess of 300MW of Power
Projects Under Execution
1) M/s Steel Authority of India Limited
- Electrical & Control Instrumentation Balance of Plant (E& CI BOP)
- One (1) Unit Auxiliary Transformer (UAT) of rating 7 MVA
- Three (3) Distribution Transformers (DT) of rating 2 MVA
2) M/s Jeppiaar Power Corporation
- Electrical & Control Instrumentation Balance of Plant (E& CI BOP)
110 kV, 3 bay Switchyard including
- One (1) Generator Transformer (GT) of rating 37.5 MVA
- One (1) Unit Auxiliary Transformer (UAT) of rating 8 MVA
- 8KM 110 kv Double circuit transmission line
3) M/s Shri Jagannath Steel and Power Limited
- Electrical & Control Instrumentation Balance of Plant (E& CI BOP)
132 kV, 1 bay Switchyard including
- One (1) Generator Transformer (GT) of rating 37.5 MVA
- One (1) Unit Auxiliary Transformer (UAT) of rating 5 MVA
4) M/s Al Ameen Green Energy Private Limited
- Electrical Balance of Plant including
- AC & DC cabling Installation
- Inverters
- String combiner bores
- Inverter duty transformers
- 11kv switchgears
- 110 kv, 1 bay switchyard, including one power transformer of rating 25MV
- 19.5km 110 kv, Double circuit transmission line 19.5km