M/s. Enmas GB Power Systems Projects Limited has successfully commissioned the 320 TPH Pulverised Fuel Boiler. The Lightup of the unit was done on 19.08.2012 and the unit is continuously operating at full load since 01.02.2013. We recommend them for similar assignments” said Mr.Rajendra Vohra M/s Sarda Metals & Alloys Ltd

 
“This is to certify that M/s. Enmas GB Power Systems Projects Limited has successfully commissioned the 26.4 TPH Waste Heat Recovery Boiler for the 12.5 MW Waste Heat Recovery Power Plant” M/s Bhatia International Limited Gummidipoondi, Tamil Nadu.

 

“This is to state that M/s. Enmas GB Power Systems Projects Limited has successfully commissioned our 6bay, 230kV Switchyard for our steel cum 70MW Captive Power Plant at Gummudipoondi, Tamilnadu and our switchyard is operating since May 2010″ Said Mr. Vinod Kothari, Director, M/s Kamachi Sponge & Power Corporation Ltd

 
“On 14th Jan’12 at about 01:15 am you could generate power at 40 MW full load and very successfully could complete the reliability test of 72 hours nonstop running.  Very good and congratulations to your full team” said Shri OP Kakkar, Director, ISMT Ltd.

 

M/s Enmas GB Power Systems Projects Limited has executed the job in a professional and systematic manner. Moreover, their commitment to customer service is really a point that requires a special mention. We recommend them for similar assignments” said Shri Vinod Kothari, Director, KSPCL, Chennai.

“This is to mention that M/s Enmas GB Power Systems Projects Limited has successfully commissioned our 110 kV switchyard for the wind farms at Rasipalayam, Tamil Nadu. The switchyard is operational since Feb’ 11 and we enthusiastically recommend them for similar assignment” told Project Manager/Substations, Gamesa Wind Turbines Pvt Ltd.

“This is to state that M/s Enmas, Chennai have supplied one (1) No. 90 TPH, 63 kg/cm2, 4500C multifuel fired CFBC boiler. The boiler is in successful operation since 1998. The execution of the project was carried out professionally by M/s Enmas to our complete satisfaction. Enmas has displayed great sincerity and commitment during the execution of the project. Their complete commitment to clients is a matter of admiration” said Shri NC Agasi Bagil, GM Production, The Mysore Paper Mills Ltd.

“This company has been consistent in their teamwork, good engineering and project management practices. They have been open to any changes in the specifications during detail engineering, flexible in adjusting themselves on war footing basis to the commissioning schedule for the benefit of the company. They have executed all 4 projects for in the scheduled time and they have been awarded bonus for completing the projects in schedule. We like to make a specific mention with regard to their service and after sales support. This has been the hallmark of Enmas and will associate with them for future projects” mentioned Shri Padmanabhan, GM Projects, ITC Limited (PSPD).

“This is to state that M/s Enmas has supplied two (2) nos. 64 TPH, 64 kg/cm2, 480 C waste heat recovery boilers for our 30 MW power project located in Goa. The boilers are in operation since Apr’07 and Jun’07 respectively” said Shri VK Ahluwalia, Director & CE, Goa Energy Pvt Ltd.

“The boiler successfully commissioned in June 2006 was later installed with Rifle bore bed coils design burning a variety of coals, is providing continuous availability from Jan, 2008 without any forced outage” said Shri R Ramesh Ramalingam, AGM Power Plant, JSW Steel Limited.