We offer solutions for the following:

  • Balance of Plant (BOP)
    • Mechanical BOP (M BOP)
    • Electrical  & Control Instrumentation BOP (E&CI BOP)

BOP packages contain several equipment that are essential mandatory for the power plant to function and these are integrated into the main Power Island Equipment package which comprises the steam generator, steam turbine generator and the condenser (air or water cooled). All packages apart from Power Island Equipment package are considered as BOP.

EGBPSPL has conclusively established its power plant integration capabilities by commissioning three units totalling 110 MW during the financial year 2011-2012 alone.

 

 
 

1 Comment